Floor
Construction:
Typical welded floor construction shown upside
down. Welded steel floor with structural channel
is supported with 3" channel. Welded
underside is primed before installing rigid
foam insulation and galvanized covering if
required. |
|
|
Welded
Frame Walls:
Typical welded tubular steel frame support
channel. Galvanized steel studs complete the
frame. All non-protected steel is primed or
galvanized. |
|
|
Insulated
& Fire-Rated Roof:
Typical installation of insulation between
roof and ceiling. Roof and ceiling are protected
with multiple layers of fire core gypsum. |
|
|
Insulated
& Fire-Rated Walls:
Typical installation of fiberglass insulation
in wall cavity; also installation of 2 layers
of Type X gypsum for fire-rating on the inside
and outside of the building.
|
|
|
Almost
Ready for Outside Wall Covering:
Outside wall covering is galvanized steel
with two part epoxy prime coat and two part
polyurethane finish coat.
|
|
|
The
Completed Product:
Manual fire alarm activation station; emergency
fan shut-off; light switch; interior shelving;
and HVAC system.
|
|
|
| Buildings
meet or exceed all applicable UBC, SBC, BOCA
National Building Codes, NFPA, UFC, EPA, NEC,
CAC, OSHA, FM and UL codes with respect compliance
in design; and meet or exceed all applicable
ANSI, AWS, AISC, US Product, ASTM, WARNOCK-HERSEY,
FM and UL standards regarding materials and
workmanship.
|