|
|
Buildings
Leave Haz-Mat on a flat bed truck going directly
to the job site. (Overseas shipments go directly
to the Port of Departure) |
|
|
Crane
Hoisting
Depending
on size, building (s) may be loaded and off-loaded
by crane or fork lift. |
|
|
|
|
|
|
|
|
|
|
|
Enroute |
|
|
Delivered
Anywhere in the World! |
| Buildings
meet or exceed all applicable UBC, SBC, BOCA
National Building Codes, NFPA, UFC, EPA, NEC,
CAC, OSHA, FM and UL codes with respect compliance
in design; and meet or exceed all applicable
ANSI, AWS, AISC, US Product, ASTM, WARNOCK-HERSEY,
FM and UL standards regarding materials and
workmanship.
|
|
|